Printing Options
 Hide Company Header - Leave lines blank
 Print continuously - Do not break pages
Adjuster Report
LKK Auto Consultants Pte Ltd (Co.Reg.No:199607198R)
51 Ubi Ave 1 #01-25, Paya Ubi Industrial Park
Singapore 408933
Tel: 6256-3561  Fax: 6844-8805   Email: sur@lkkauto.com;assignments@lkkauto.com

VEHICLE DAMAGE INSPECTION REPORT

  Our File No:CS/CTI20005308/KYF3Q2
Date:04/06/2020

REFERENCE
Handling Insurer:China Taiping Insurance (Singapore) Pte. Ltd. Policy No:DMCVSNW00014252004
Claimant Vehicle No : SLZ1077TInsured Vehicle No : GBD7222K
Date of Loss:10/04/2020 Nature of Claim:TP Claim No: SNM20D201772/C02/ELIZABETH

DESCRIPTION & IDENTIFICATION OF VEHICLE
Reg No:SLZ1077T
Make & Model:HONDA SHUTTLE, 1.5 (A) Engine No:LEB6550040
Reg. Date:23/04/2018 (Man. Year: 2018) Chassis No: GP71208208
Colour:Metallic Grey Odometer:135145 km
Engine Capacity:1496 cc
Market Value/New Car Price:N/A
Sum Insured (S$):Market Value/New Car Price

CONDITION OF VEHICLE AT THE TIME OF SURVEY
General Condition: Steering (Serviceable):Yes Footbrake (Serviceable):Yes
Handbrake (Serviceable):Yes Engine Modification:No Pre-accident Condition:

CONDITION OF TYRES
Front Tyre Size:185/60R15 Rear Tyre Size:185/60R15
Front Left Side: Nexen  8 mm Rear Left Side: Nexen  7 mm
Front Right Side:Nexen  8 mm Rear Right Side:Nexen  7 mm
The above values represent the remaining tyre treads depth

COST OF CLAIMS Repairer's Adjuster's DifferenceDiff %
Parts 2,229.12 2,092.40 136.72 6.13
Miscellaneous Items 0.00 0.00 0.00  
Labour 1,300.00 890.00 410.00 31.54
Paintwork Labour 0.00 0.00 0.00  
Towing 0.00 0.00 0.00  
  
Gross Total (S$) 3,529.12 2,982.40 546.72 15.49
+ GST 7.00/7.00% (S$) 247.04 208.77 38.27 15.49
  
Nett Amount (S$) 3,776.16 3,191.17 584.99 15.49
  

INSPECTION
Date of Assignment:03/06/2020
Date Inspected:13/05/2020 Inspected At:385 Sin Ming Drive
Repairer: Esteem Performance Pte Ltd (HQ)
Blk 5033 Ang Mo Kio Ind Park 2, #01-259
Singapore 569536
Estimated Period of Repair:3.0 days



Adjuster: KENNETH KONG   Manager: YVONNE WONG YIN CHENG
 
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.

 
REPAIR DETAILS
Reference
Part Source: (Last Synchronised: 04 Jun 2020)
Parts:N/AHONDA SHUTTLE 1.5 (A) (Model not available in database)
Labour:Repairer's(Price-denominated Standard List) 
Print Code:(Unsubmitted, no print-code for SLZ1077T)
Validity:These estimates are valid only if they contain the print code (above) on all estimate pages, running page numbers with the END OF ESTIMATES marker on the last estimate page
Further Info:Items/values not in reference catalogue are prefixed with an asterisk *.


Recommended Parts
Report was unsubmitted during this print-out.
No.Qty Part No. Particulars Condition Repairer's Amount

1 1 *FRONT BUMPER Deep Cut 1,150.60 FL *1,150.60 FL
2 10 *FRONT BUMPER CLIP Necessary 35.00 FL *35.00 FL
3 1 *FRONT BUMPER SIDE RETAINER RH Serviceable 25.40 FL *- FL
4 1 *RH FRONT FENDER Bent 411.90 FL *411.90 FL
5 1 *RH FRONT FENDER UNDERSHIELD Serviceable 110.50 FL *- FL
6 10 *RH FRONT FENDER UNDERSHIELD CLIP Not Necessary 35.00 FL *- FL
7 1 *RHF FENDER WORDING HYBRID Necessary 68.00 FL *68.00 FL
8 1 *HEADLAMP RH Cut 950.00 FL *950.00 FL
F=Franchise part. L=ListItemDisc.
Sub Total (S$)2,786.40 2,615.50
- List Item Discount on L Items 20.00/20.00% (S$) 557.28523.10
 
Total Parts (S$) 2,229.12 2,092.40
 
 
Recommended Miscellaneous Items
There are no new miscellaneous items selected.

Recommended Labour
Report was unsubmitted during this print-out.
NoParticulars Lab.Type Repairer's Amount

Labour Items
1 TO RENEW DAMAGED PARTS & KNOCK OUT ACCIDENT REPAIR AREA.(FRONT BUMPER,LHF FENDER) New 600.00 400.00
2 TO PUTTY,RESPRAY PAINT FOR AFFECTED ACCIDENT REPAIR AREA.(FRONT BUMPER,LHF FENDER) New 600.00 440.00
3 TO CHECK WIRING & FOCUS HEADLAMP New 50.00 20.00
4 TO TUFF COAT New 50.00 30.00
 
Gross Labour Cost (S$) 1,300.00890.00
 

< END OF ESTIMATES >