VEHICLE DAMAGE INSPECTION REPORT
|
AIG Asia Pacific Insurance Pte. Ltd. AIG Building, 78 Shenton Way, #09-16 Singapore 079120 |
Our File No: | CC3/AIG20004630/EVF3N2 |
| Date: | 22/06/2020 |
REFERENCE |
| Insured/Claimant: | ROSLI BIN MAWI |
Policy No: | 1800035254-01 |
| Date of Loss: | 24/03/2020 |
Nature of Claim: | OD |
Claim No: |
9414135840SG
|
| DESCRIPTION & IDENTIFICATION OF VEHICLE |
| Reg No: | SLX7198Z |
| Make & Model: | AUDI A3, 999cc TFSI S TRONIC (LED) (A) |
Engine No: | CHZ689534 |
| Reg. Date: | 07/04/2018 (Man. Year: 2018) |
Chassis No: |
WAUZZZ8V4J1052340 |
| Colour: | Blue |
Odometer: | 29927 km |
| Engine Capacity: | 999 cc |
| Market Value/New Car Price: | S$91,000.00 |
| Sum Insured (S$): | Market Value/New Car Price |
| CONDITION OF VEHICLE AT THE TIME OF SURVEY |
| General Condition: | |
Steering (Serviceable): | Yes | Footbrake (Serviceable): | Yes |
| Handbrake (Serviceable): | Yes |
Engine Modification: | No |
Pre-accident Condition: | |
| CONDITION OF TYRES |
| Front Tyre Size: | 225/40 ZR18 |
Rear Tyre Size: | 225/40 ZR18 |
|
Front Left Side:
| Pirelli 6 mm | |
Rear Left Side:
| Pirelli 6 mm | |
| Front Right Side: | Pirelli 6 mm | |
Rear Right Side: | Pirelli 6 mm | |
| The above values represent the remaining tyre treads depth |
| Parts |
2,646.40 |
1,799.44
|
846.96 |
32.00 |
| Miscellaneous Items |
0.00 |
0.00 |
0.00 |
|
| Labour |
2,752.00 |
2,472.00 |
280.00 |
10.17 |
| Paintwork Labour |
0.00 |
0.00 |
0.00 |
|
| Towing |
0.00 |
0.00 |
0.00 |
|
| | |
|
Calculated Gross Total
(S$)
|
5,398.40 |
4,271.44 |
1,126.96 |
20.88 |
| - Excess (S$) |
600.00 |
600.00 |
0.00 |
0.00 |
| | |
| (S$) |
4,798.40 |
3,671.44 |
1,126.96 |
23.49 |
| +
GST 7.00/7.00% (S$)
|
335.89 |
257.00 |
78.89 |
23.49 |
| | |
| Nett Amount (S$) |
5,134.29 |
3,928.44 |
1,205.85 |
23.49 |
| | |
| INSPECTION |
| Date of Assignment: | 30/03/2020 |
| Date Inspected: | 27/03/2020 |
Inspected At: | 24 Benoi Sector Repairer: Premium Automobiles Pte Ltd 55 Ubi Road 1 Singapore 408699 |
| Estimated Period of Repair: | 5.0 days |
| Adjuster: |
CHEN TSUE YEE |
|
Manager:
|
VERON CHEN
|
|
|
|
|
|
|
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.
|
Recommended Parts
| Report was unsubmitted during this print-out. |
| No. | Qty |
Part No. |
Particulars |
Condition | Repairer's | |
Amount |
|
| 1 |
1 |
|
*TRACK CONTROL ARM |
Bent |
345.00 |
FS |
*275.60 |
FS |
| 2 |
1 |
|
*GUIDE JOINT-RH |
Bent |
119.00 |
FS |
*95.20 |
FS |
| 3 |
1 |
|
*COUPLING ROD |
Necessary |
90.00 |
FS |
*71.36 |
FS |
| 4 |
1 |
|
*SUSPENSION STRUT STORAGE |
Necessary |
117.00 |
FS |
*93.20 |
FS |
| 5 |
1 |
|
*BEARING |
Necessary |
44.00 |
FS |
*34.72 |
FS |
| 6 |
1 |
|
*SHOCK ABSORBER RUBBER STOP |
Necessary |
52.00 |
FS |
*40.96 |
FS |
| 7 |
1 |
|
*BELLOWS |
Necessary |
39.00 |
FS |
*30.80 |
FS |
| 8 |
1 |
|
*SHELF |
Not Necessary |
20.00 |
FS |
- |
|
| 9 |
1 |
|
*GAS SHOCK ABSORBER |
Bent |
256.00 |
FS |
*204.80 |
FS |
| 10 |
1 |
|
*COIL SPRING |
Not Necessary |
234.00 |
FS |
- |
|
| 11 |
1 |
|
*WHEEL BEARING HOUDING |
Necessary |
555.00 |
FS |
*443.60 |
FS |
| 12 |
1 |
|
*WHEEL BEARING |
Necessary |
479.00 |
FS |
*383.20 |
FS |
| 13 |
1 |
|
*TIE ROD END RHS |
Bent |
96.40 |
FS |
*96.40 |
FS |
| 14 |
1 |
|
*SUNDRIES |
Necessary |
200.00 |
FS |
*29.60 |
FS |
| F=Franchise part. S=SpcNett. |
|
| Total Parts (S$) |
2,646.40 | | 1,799.44 | |
| |
|
Recommended Miscellaneous Items
There are no new miscellaneous items selected. |
Recommended Labour
| Report was unsubmitted during this print-out. |
| No | Particulars |
Lab.Type | Repairer's | Amount |
|
| Labour Items |
| 1 |
TO TOW AND RECOVER VEHICLE FROM SCENE OF ACCIDENT |
New |
280.00 | 0.00 |
| 2 |
TO RENEW RHS FRONT WHEEL SUSPENSION ASSY |
New |
1,800.00 | 1,800.00 |
| 3 |
TO CARRY OUT PRE-REPAIR WHEEL ALIGNMENT TEST AND POST-REPAIR WHEEL ALIGNMENT TEST |
New |
480.00 | 480.00 |
| 4 |
TO CARRY OUT DIAGNOSTIC CHECK |
New |
192.00 | 192.00 |
| |
|
| Gross Labour Cost (S$) |
2,752.00 | 2,472.00 |
| |
|
< END OF ESTIMATES >