Printing Options
 Hide Company Header - Leave lines blank
 Print continuously - Do not break pages
Adjuster Report
LKK Auto Consultants Pte Ltd (Co.Reg.No:199607198R)
51 Ubi Ave 1 #01-25, Paya Ubi Industrial Park
Singapore 408933
Tel: 6256-3561  Fax: 6844-8805   Email: sur@lkkauto.com;assignments@lkkauto.com

VEHICLE DAMAGE INSPECTION REPORT

  Our File No:CS/CTI20004245/DYF3N2
Date:24/04/2020

REFERENCE
Handling Insurer:China Taiping Insurance (Singapore) Pte. Ltd. Policy No:DMPCSN30326419000
Claimant Vehicle No : FBP6464YInsured Vehicle No : SJQ9878S
Date of Loss:17/03/2020 Nature of Claim:TP Claim No: SNM20D201361C01

DESCRIPTION & IDENTIFICATION OF VEHICLE
Reg No:FBP6464Y
Make & Model:YAMAHA XMAX 300, 292cc Engine No:H336E0063798
Reg. Date:22/10/2019 (Man. Year: 2019) Chassis No: MH3SH0849KK008714
Colour:Black Odometer:10192 km
Engine Capacity:292 cc
Market Value/New Car Price:N/A
Sum Insured (S$):Market Value/New Car Price

CONDITION OF VEHICLE AT THE TIME OF SURVEY
General Condition: Steering (Serviceable):Yes Footbrake (Serviceable):Yes
Handbrake (Serviceable):Yes Engine Modification:No Pre-accident Condition:

CONDITION OF TYRES
Front Tyre Size:120/70R15 Rear Tyre Size:140/70R14
Front Left Side: Dunlop  4 mm Rear Left Side: Dunlop  4 mm
Front Right Side:  0 mm Rear Right Side:  0 mm
The above values represent the remaining tyre treads depth

COST OF CLAIMS Repairer's Adjuster's DifferenceDiff %
Parts 1,842.70 1,559.20 283.50 15.39
Miscellaneous Items 0.00 0.00 0.00  
Labour 630.00 300.00 330.00 52.38
Paintwork Labour 0.00 0.00 0.00  
Towing 0.00 0.00 0.00  
  
Calculated Gross Total (S$) 2,472.70 1,859.20 613.50 24.81
Approved Total (Overridden) (S$) 1,450.00
  
Nett Amount (S$) 2,472.70 1,450.00 1,022.70 41.36
  

INSPECTION
Date of Assignment:19/03/2020
Date Inspected:20/03/2020 Inspected At:S9 Motor Trading Pte Ltd (HQ)
4001 ANG MO KIO INDUSTRIAL PARK 1 #01-21
Singapore 569622
Estimated Period of Repair:3.0 days



Adjuster: BRYAN TANI   Manager: YVONNE WONG YIN CHENG
 
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.

 
REPAIR DETAILS
Reference
Part Source: (Last Synchronised: 24 Apr 2020)
Parts:N/AYAMAHA XMAX 300 292cc (Model not available in database)
Labour:Repairer's(Price-denominated Standard List) 
Print Code:(Unsubmitted, no print-code for FBP6464Y)
Validity:These estimates are valid only if they contain the print code (above) on all estimate pages, running page numbers with the END OF ESTIMATES marker on the last estimate page
Further Info:Items/values not in reference catalogue are prefixed with an asterisk *.


Recommended Parts
Report was unsubmitted during this print-out.
No.Qty Part No. Particulars Condition Repairer's Amount

1 1 *HANDLE BAR Not Necessary 165.00 FL *- FL
2 1 *MIRROR LH Cut 90.00 FL *90.00 FL
3 1 *BRAKE LEVER Cut 95.00 FL *95.00 FL
4 1 *SET BALANCER Not Necessary 150.00 FL *- FL
5 1 *FRONT BOTTOM COVER Cut 155.00 FL *155.00 FL
6 1 *FRONT TOP COVER Cut 145.00 FL *145.00 FL
7 1 *HEAD LAMP INNER GUARD Broken 210.00 FL *210.00 FL
8 1 *BODY FRONT UNDER LH Cut 90.00 FL *90.00 FL
9 1 *LH COVER SIDE COWLING Cut 138.00 FL *138.00 FL
10 1 *MOLE SIDE COVER Cut 98.00 FL *98.00 FL
11 1 *BOARD FOOTREST LH Broken 128.00 FL *128.00 FL
12 1 *GRILLE AIR INTAKE Broken 145.00 FL *145.00 FL
13 1 *LH COVER SIDE REAR Cut 110.00 FL *110.00 FL
14 1 *ENGINE CENTRE COVER Cut 156.00 FL *156.00 FL
15 1 *COOLANT BRACKET Bent 78.00 FL *78.00 FL
16 1 *YAMAHA EMBLEM LH Cut 85.00 FS *85.00 FS
F=Franchise part. S=SpcNett. L=ListItemDisc.
Sub Total (S$)2,038.00 1,723.00
- List Item Discount on L Items 10.00/10.00% (S$) 195.30163.80
 
Total Parts (S$) 1,842.70 1,559.20
 
 
Recommended Miscellaneous Items
There are no new miscellaneous items selected.

Recommended Labour
Report was unsubmitted during this print-out.
NoParticulars Lab.Type Repairer's Amount

Labour Items
1 WELDING BODY & COOLANT BRACKET New 130.00 60.00
2 REMOVE & REPLACE PARTS,ALIGN & ETC New 250.00 120.00
3 PUTTY & TOUCH UP PAINT WORK New 250.00 120.00
 
Gross Labour Cost (S$) 630.00300.00
 

< END OF ESTIMATES >