Adjuster Report
VEHICLE DAMAGE INSPECTION REPORT
|
AIG Asia Pacific Insurance Pte. Ltd. AIG Building, 78 Shenton Way #08-16 Singapore 079120 |
Our File No: | CC3/AIG19022564/EVD3N2 |
| Date: | 13/04/2020 |
REFERENCE |
| Insured/Claimant: | ANITA BOENTORO |
Policy No: | 2100408855 |
| Date of Loss: | 19/12/2019 |
Nature of Claim: | OD |
Claim No: |
0148090488SG
|
| DESCRIPTION & IDENTIFICATION OF VEHICLE |
| Reg No: | SCW9208C |
| Make & Model: | AUDI A6, 2.0 TFSI MU (A) |
Engine No: | CDN417015 |
| Reg. Date: | 17/04/2015 (Man. Year: 2014) |
Chassis No: |
WAUZZZ4G0EN201672 |
| Colour: | Silver |
Odometer: | 40000 km |
| Engine Capacity: | 1984 cc |
| Market Value/New Car Price: | S$91,000.00 |
| Sum Insured (S$): | Market Value/New Car Price |
| CONDITION OF VEHICLE AT THE TIME OF SURVEY |
| General Condition: | |
Steering (Serviceable): | Yes | Footbrake (Serviceable): | Yes |
| Handbrake (Serviceable): | Yes |
Engine Modification: | No |
Pre-accident Condition: | |
| CONDITION OF TYRES |
| Front Tyre Size: | 225/55R17 |
Rear Tyre Size: | 225/55R17 |
|
Front Left Side:
| Michelin 5 mm | |
Rear Left Side:
| Michelin 5 mm | |
| Front Right Side: | Michelin 5 mm | |
Rear Right Side: | Michelin 5 mm | |
| The above values represent the remaining tyre treads depth |
| Parts |
1,463.20 |
822.16
|
641.04 |
43.81 |
| Miscellaneous Items |
0.00 |
0.00 |
0.00 |
|
| Labour |
3,792.00 |
1,242.00 |
2,550.00 |
67.25 |
| Paintwork Labour |
0.00 |
0.00 |
0.00 |
|
| Towing |
0.00 |
0.00 |
0.00 |
|
| | |
|
Calculated Gross Total
(S$)
|
5,255.20 |
2,064.16 |
3,191.04 |
60.72 |
| - Excess (S$) |
800.00 |
800.00 |
0.00 |
0.00 |
| | |
| (S$) |
4,455.20 |
1,264.16 |
3,191.04 |
71.63 |
| +
GST 7.00/7.00% (S$)
|
311.86 |
88.49 |
223.37 |
71.63 |
| | |
| Nett Amount (S$) |
4,767.06 |
1,352.65 |
3,414.41 |
71.63 |
| | |
| INSPECTION |
| Date of Assignment: | 24/12/2019 |
| Date Inspected: | 24/12/2019 |
Inspected At: | 281 ALEXANDRA ROAD REPAIRER: PREMIUM AUTOMOBILES PTE LTD 55 UBI ROAD 1 . SINGAPORE 408699 |
| Estimated Period of Repair: | 3.0 days |
| Adjuster: |
CHEN TSUE YEE |
|
Manager:
|
VERON CHEN
|
|
|
|
|
|
|
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.
|
Recommended Parts
| Report was unsubmitted during this print-out. |
| No. | Qty |
Part No. |
Particulars |
Condition | Repairer's | |
Amount |
|
| 1 |
1 |
|
*SIDE MEMBER-LH |
Broken |
783.00 |
FS |
*626.40 |
FS |
| 2 |
4 |
|
*CLIP ATTACHMENT PARTS |
Necessary |
96.00 |
FS |
*76.56 |
FS |
| 3 |
1 |
|
*ADHESIVE TAPE ATTACHMENT PARTS |
Necessary |
15.00 |
FS |
*11.36 |
FS |
| 4 |
1 |
|
*STONE CHIP |
Not Necessary |
180.00 |
FS |
*- |
FS |
| 5 |
1 |
|
*SUNDRIES |
Necessary |
300.00 |
FS |
*18.64 |
FS |
| 6 |
1 |
|
*STONE GUARD FILM LHS |
Necessary |
89.20 |
FS |
*89.20 |
FS |
| F=Franchise part. S=SpcNett. |
|
| Total Parts (S$) |
1,463.20 | | 822.16 | |
| |
|
Recommended Miscellaneous Items
There are no new miscellaneous items selected. |
Recommended Labour
| Report was unsubmitted during this print-out. |
| No | Particulars |
Lab.Type | Repairer's | Amount |
|
| Labour Items |
| 1 |
TO DISMANTLE AND RENEW LHS SILL PANEL TRIM.TO REPAIR LHS SILL PANEL.RE-ORGANISE CRASH MANAGEMENT COMPONENTS.REINSTALL ALL PARTS REMOVED |
New |
1,600.00 | 500.00 |
| 2 |
TO RESPRAY LHS SILL PANEL TRIM AND LHS SILL PANEL |
New |
2,000.00 | 550.00 |
| 3 |
TO CARRY OUT DIAGNOSTIC CHECK |
New |
192.00 | 192.00 |
| |
|
| Gross Labour Cost (S$) |
3,792.00 | 1,242.00 |
| |
|
< END OF ESTIMATES >