Printing Options
 Hide Company Header - Leave lines blank
 Print continuously - Do not break pages
Adjuster Report
LKK Auto Consultants Pte Ltd (Co.Reg.No:199607198R)
51 Ubi Ave 1 #01-25, Paya Ubi Industrial Park
Singapore 408933
Tel: 6256-3561  Fax: 6844-8805   Email: sur@lkkauto.com;assignments@lkkauto.com

VEHICLE DAMAGE INSPECTION REPORT

  Our File No:CS/CTI19022296/EVF3N2
Date:18/05/2020

REFERENCE
Handling Insurer:China Taiping Insurance (Singapore) Pte. Ltd. Policy No:DMCVSN30325519000
Claimant Vehicle No : YP5629ZInsured Vehicle No : YP6484S
Date of Loss:09/12/2019 Nature of Claim:TP Claim No: SNM19D205935C02

DESCRIPTION & IDENTIFICATION OF VEHICLE
Reg No:YP5629Z
Make & Model:ISUZU NHR85AUE4A, 3.0 D R1 (M) Engine No:4JJ12P5959
Reg. Date:21/03/2017 (Man. Year: 2016) Chassis No: JAANHR85EG7100301
Colour:White Odometer:147857 km
Engine Capacity:2999 cc
Market Value/New Car Price:N/A
Sum Insured (S$):Market Value/New Car Price

CONDITION OF VEHICLE AT THE TIME OF SURVEY
General Condition: Steering (Serviceable):Yes Footbrake (Serviceable):Yes
Handbrake (Serviceable):Yes Engine Modification:No Pre-accident Condition:

CONDITION OF TYRES
Front Tyre Size:195/75R15 Rear Tyre Size:195/75R15
Front Left Side: Yokohama  5 mm Rear Left Side: Yokohama  5 mm
Front Right Side:Yokohama  5 mm Rear Right Side:Yokohama  5 mm
The above values represent the remaining tyre treads depth

COST OF CLAIMS Repairer's Adjuster's DifferenceDiff %
Parts 8,055.50 4,034.00 4,021.50 49.92
Miscellaneous Items 0.00 0.00 0.00  
Labour 1,100.00 960.00 140.00 12.73
Paintwork Labour 0.00 0.00 0.00  
Towing 0.00 0.00 0.00  
  
Calculated Gross Total (S$) 9,155.50 4,994.00 4,161.50 45.45
Approved Total (Overridden) (S$) 4,000.00
  
(S$) 9,155.50 4,000.00 5,155.50 56.31
+ GST 7.00/7.00% (S$) 640.89 280.00 360.89 56.31
  
Nett Amount (S$) 9,796.39 4,280.00 5,516.39 56.31
  

INSPECTION
Date of Assignment:30/12/2019
Date Inspected:02/01/2020 Inspected At:Mova Automotive Pte Ltd (FAN YOONG BRANCH)
15 Fan Yoong Road, CNG Singapore Centre
Singapore 629792
Estimated Period of Repair:10.0 days



Adjuster: CHEN TSUE YEE   Manager: VERON CHEN
 
NOTE: This report represents our findings at the time and place of inspection stated herein. Such inspection has been carried out to the best of our knowledge and ability but any other liability under any other circumstances is hereby expressly excluded.

 
REPAIR DETAILS
Reference
Part Source: (Last Synchronised: 14 May 2020)
Parts:N/AISUZU NHR85AUE4A 3.0 D R1 (M) (Model not available in database)
Labour:Repairer's(Price-denominated Standard List) 
Print Code:(Unsubmitted, no print-code for YP5629Z)
Validity:These estimates are valid only if they contain the print code (above) on all estimate pages, running page numbers with the END OF ESTIMATES marker on the last estimate page
Further Info:Items/values not in reference catalogue are prefixed with an asterisk *.


Recommended Parts
Report was unsubmitted during this print-out.
No.Qty Part No. Particulars Condition Repairer's Amount

1 1 *RH FRONT DOOR Dented 1,430.00 FL *1,200.00 FL
2 1 *RH FRONT DOOR SIGNAL LAMP Cut 260.00 FL *200.00 FL
3 1 *RH FRONT DOOR WHEEL ARCH GARNISH Broken 230.00 FL *230.00 FL
4 1 *RH FRONT SIGNAL LAMP Not Necessary 260.00 FL *- FL
5 1 *RH FRONT DOOR GLASS CHANNEL Not Necessary 240.00 FL *- FL
6 1 *RH FRONT DOOR HANDLE Cut 210.00 FL *210.00 FL
7 1 *RH SIDE REAR TOOL BOX Repair 650.00 FS *- FS
8 1 *RH SIDE TOW TRUCK PANEL Dented 4,500.00 FS *2,000.00 FS
9 1 *RH FRONT DOOR LTA STICKER Necessary 20.00 FS *20.00 FS
10 1 *SET RH FRONT DOOR INSULATOR STICKER Necessary 450.00 FS *300.00 FS
11 1 *RH SIDE TOW TRUCK PANEL STICKER Necessary 200.00 FS *150.00 FS
F=Franchise part. S=SpcNett. L=ListItemDisc.
Sub Total (S$)8,450.00 4,310.00
- List Item Discount on L Items 15.00/15.00% (S$) 394.50276.00
 
Total Parts (S$) 8,055.50 4,034.00
 
 
Recommended Miscellaneous Items
There are no new miscellaneous items selected.

Recommended Labour
Report was unsubmitted during this print-out.
NoParticulars Lab.Type Repairer's Amount

Labour Items
1 TO INSPECT FRONT LIGHTING WATER & LEAKAGE TEST New 40.00 30.00
2 TO REMOVE & TRANSFER ITEMS TO RH FRONT NEW DOOR New 100.00 50.00
3 TO STRAIGHTEN AFFECTED AREAS & RENEW DAMAGED PARTS New 300.00 250.00
4 TO APPLY RUST PROOF ON AFFECTED AREAS New 60.00 30.00
5 TO SPRAY PAINT ON REPLACED,REPAIRED AREAS New 600.00 600.00
 
Gross Labour Cost (S$) 1,100.00960.00
 

< END OF ESTIMATES >